Launch pricePhase 2 prices hold until 31 December

Quiet streets, five minutes from the toll gate.

A gated cluster of homes on 4.2 hectares in Cibubur. Tree-lined roads, one gate, and three house types designed for how families actually live.

Quiet residential street in Teduh Residence after rain
homes leftof in Phase 2
Rp 895 jtStarting price
3House types, 36 to 60 m²
4.2 haCluster area, 32% green
Q3 2027Handover, Phase 2
House types

Three plans, one street.

Every type has a carport, a back garden and room to grow upward. Floor plans are drawn to scale.

Site plan · live availability

Pick your lot.

Tap any lot to see its size, position and price. Corner lots carry a 7.5% premium for the extra land.

AvailableBookedSold
Mortgage simulator

What will it cost per month?

An estimate with our partner bank promo: fixed for the first three years, then a floating rate.

10%50%
5 yrs25 yrs
3%8%
Estimated instalment
Years 1–3 (fixed)
Year 4 onward (floating 10.5%)
House price
Down payment
Loan amount
Suggested monthly income
Down paymentPrincipalInterest
Illustration only. Final rate, fees and approval depend on the bank. Income guide assumes the instalment is at most a third of take-home pay.
Facilities

Everything inside the gate.

One-gate system

A single entrance with access cards and a guard post.

24-hour security

Patrols, CCTV on every road, and a panic line to the post.

Central park

A 3,000 m² park with a playground and shaded seating.

Jogging loop

An 800 m track around the cluster under tabebuya trees.

Mosque

A neighbourhood mosque for 300, a short walk from every home.

Clubhouse & pool

Lap pool, kids' pool and a hall residents can book.

JAGORAWI TOLL ROAD Toll gate LRT Harjamukti Hospital Mall International school Teduh Residence
Location

Close to everything, on a street with none of it.

  • 5minCibubur toll gate (Jagorawi)2.1 km
  • 12minLRT Harjamukti station5.4 km
  • 10minHospital and medical centre4.0 km
  • 8minMall and supermarket3.2 km
  • 15minInternational and national schools6.8 km
Ways to pay

Choose a payment plan.

Mortgage (KPR)

Most chosen

Down payment from 10%, tenor up to 25 years, with three partner banks handling approval on site.

Instalment cash

0% interest

Pay the full price in 12 or 24 monthly instalments directly to the developer, after a 20% down payment.

Hard cash

5% off

Pay in full within 30 days of booking and receive a 5% discount on the house price.

Specifications

Built properly.

FoundationReinforced concrete footing and tie beams
StructureReinforced concrete columns, earthquake-resistant detailing
WallsLightweight concrete block, plastered and painted
RoofLight steel frame, flat concrete roof tile
Floors60 × 60 homogeneous tile, 20 × 20 in bathrooms
Windows & doorsAluminium frames, solid wood main door
Electricity2,200 VA (3,500 VA for Type 60)
WaterMunicipal supply with ground tank and pump
FAQ

Before you visit.

Still deciding? Our sales team can walk you through the show units seven days a week.

What is the booking fee?+

Rp 10 million holds your chosen lot for 14 days while you arrange the down payment or mortgage. It is deducted from the down payment.

What certificate do the homes have?+

Each lot has its own SHGB title, split from the master certificate before handover, and IMB/PBG building approval.

Can I renovate or add a second floor?+

Yes. Type 36 and 45 foundations are designed for a second floor. Front façade changes follow the estate guidelines to keep the street consistent.

Is there a monthly service charge?+

Rp 350,000 per month covers security, waste collection, street lighting and maintenance of the park and roads.

When is handover?+

Phase 2 is planned for Q3 2027. Construction progress photos are shared with buyers every month.

E-Brochure

Take the whole project home with you.

Floor plans, site plan, specifications, payment schemes and a sample mortgage table, in one PDF you can share with the family over dinner.

  • Dimensioned floor plans for all 3 types
  • Full site plan with lot sizes
  • Technical specifications
  • KPR and instalment price list
  • Facilities and location map
  • Handover timeline, Phase 2
PDF · 24 pages12 MB · Updated this month

Walk the street before you choose.

Visit the marketing gallery and two furnished show units. Open daily, 09.00–17.00.